Building and loading application onto PLC

Use the command Build and Load Application in the Instances view, if you want to create the application for one →PLC and load it onto this PLC. If the PLC is not available, you might want to use the command Build Application.

Conditions for Build and Load Application:

How to load your application in STapplication in FBD and/or application in LD-editor onto a PLC (the necessary binary files are automatically built in the process):

  1. In the Instance view: Select the requested PLC (= appertaining IEC-resource with icon ) or one of the children.
    Result: Above the toolbar for the view, the selected PLC incl. the project name is displayed. 

  2. Before loading, check the state information of the PLC to make sure that you have selected the correct PLC and that it is available.

  3. Click  in order to load the programs assigned in the PLC-object (i.e. the binary files) onto the PLC.
    Result: The Build Log view informs you whether the application has been built successfully or not. If the application has been built successfully, the fingerprint for line Code identification below of PLC Information within the Instances view is updated so that it matches the fingerprint for the IEC-resource.
    If  is not avalable, see "Disabled button "Build and Load Application"" for causes and solutions.

After loading, Neuron Power Engineer starts the application on the PLC. Mind the following:

The target system influences the application.

See "Properties and restrictions specific to the target system".

Good to know

(grey lightbulb)The Resource Manager view provides the possibility to build the application for several PLCs in one go and to load them afterwards.

More useful information:

FAQ articles

Troubleshooting articles